Emotion Network Breakdown Relates to Baseline Autonomic Dysfunction in Behavioral Variant Frontotemporal Dementia (P6.242).

Virginia Sturm, Jesse Brown, Alice Hua, Sandy Lwi, Howard Rosen, Bruce Miller, Robert Levenson, William Seeley. Emotion Network Breakdown Relates to Baseline Autonomic Dysfunction in Behavioral Variant Frontotemporal Dementia (P6.242). Neurology. 2016 Apr 5; 86(16_supplement).

2016
https://researcherprofiles.org/profile/462572534

Virginia Sturm, Jesse Brown, Alice Hua, Sandy Lwi, Howard Rosen, Bruce Miller, Robert Levenson, William Seeley